Linking Existing Issues
Link existing Jira issues to BlameTrail incidents and sync status.
Linking Existing Issues
If a Jira issue already exists for an incident, you can link it instead of creating a new one.
Linking an issue
- Open an incident in BlameTrail.
- Scroll to the Jira Issues card.
- Click Link Existing.
- Enter the Jira issue key (e.g.,
PROJ-123). - Click Link Issue.
BlameTrail verifies the issue exists in Jira and fetches its current summary, status, and assignee. The link appears immediately on the incident page.
Status synchronization
When a linked Jira issue's status changes, BlameTrail receives a webhook notification and updates the displayed status automatically.
Auto-resolve
If auto-resolve is enabled for your Jira installation, BlameTrail will automatically resolve the incident when the linked Jira issue moves to a "Done" status category. This is disabled by default.
Unlinking
To remove a link, click the x button next to the issue in the Jira Issues card. This only removes the link in BlameTrail — the Jira issue is not affected.
Linked issue display
Each linked issue shows:
- Issue key — Clickable link to open in Jira (e.g.,
PROJ-123) - Summary — The issue title from Jira
- Status — Current Jira status (e.g., "In Progress", "Done")
- Assignee — Who is assigned in Jira
- Link type — Whether it was "created" from BlameTrail or "linked" manually